Manchester, England
Services
Steel works, Barriers, Air Sealing & Fire StoppingContractor
Vinci ConstructionValue
£242,000The problem
When Waters Corporation looked to create a Mass Spectrometry center in Greater Manchester, their new build required various passive fire protection.
The solution
The project required steel work protection and void barriers to meet building regulations and to preserve as much of the building and its contents should the worst happen. By fitting beam cladding and intumescent paints, the structural steel has been protected throughout the whole building.
The outcome
The fire stopping and cavity barriers installed in the compartment walls will assist in slowing the spread of fire by containing a fire for up to 60minutes in the hope the fire can be extinguished before further damage can be done. All of the above, inclusive of all air sealing to the building envelope, have been completed as per building regulation requirements.
Projects completed
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla aliquam, velit a maximus laoreet, quam leo fringilla eros, vitae interdum ex lorem sed quam.
% Satisfaction rate
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla aliquam, velit a maximus laoreet, quam leo fringilla eros, vitae interdum ex lorem sed quam.
Trained employees
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla aliquam, velit a maximus laoreet, quam leo fringilla eros, vitae interdum ex lorem sed quam.
Dublin Office
Fire Protection Specialists
Cherry Orchard Industrial Estate
Palmerston
County Dublin D10
Ireland
UK Office
Fire Protection Specialists
Hewitt House
Winstanley Road
Orrell
WN5 7XA
United Kingdom
Netherlands Office
Fire Protection Specialists
B.V Zekeringstraat 17-A
1014 BM
Amsterdam
Netherlands
Northwest Hub Office
Fire Protection Specialists
Millbrae,
Gort Glebe,
Carndonagh,
Co. Donegal
F93 WY07
Denmark Office
Fire Protection Specialists
Kompagnistræde 21
First Floor
DK - 1208 Copenhagen
Denmark,